Top-down workflow

I want to use an existing plant as a starting point and modify it for my customer-specific plant.

Create a project

1

Create an ABT project.

Project Manager

2

Define passwords for all users in ABT Site > Settings > User profiles.

User profiles

Define the project settings

1

Select the pre-configuration file for the library behavior in the project.

Pre-configuration file

2

Select the desired notification class template for the behavior in the project.

Checking the notification classes template in the project

3

Define building names in Settings > Naming defaults > Object names tab.

Object names tab

4

Define ranges for network properties of automation stations in Settings > Number ranges.

Number ranges

Create a building structure

1

Go to Building > Building structure.

Building structure

2

Define a building structure (buildings, building elements).

Defining a building structure

Add a device

1

Add a device.

Adding devices

Add a plant

1

Add a plant:

-- Drag a plant from the Library to Add plant in the Plants navigation view.

Library
Working with the library

2

(Optional) Rename the plant.

Renaming elements

3

Get an overview of the plant:

-- In Plants navigation view, expand the chart list to see all elements of the plant.

-- In Plants navigation view, expand the Field devices folder to see all field devices.

-- In the Field programming editor, zoom and scroll to see details.

Plants navigation view
Working with the plant navigation view
Programming editor
Working with the Programming editor

Change a program block

1

Drag a new program block from the Library to the chart.

Working with the library

2

Rename the program block.

Renaming elements

3

Show and hide pins.

Showing and hiding pins

4

Connect the I/Os to the new program block.

Working with the Programming editor

5

Delete the existing program block.

Working with the Programming editor

Change an I/O

1

Create and assign TX & Onboard I/Os.

Creating I/O data points

2

Change an I/O:

-- Drag a new I/O from the Library to the chart.

Working with the library

3

Show and hide pins.

Showing and hiding pins

4

Connect the new I/O to the program block.

Working with the Programming editor

5

Delete the existing I/O.

Working with the Programming editor

Save a solution to the Custom library

1

Add one or more elements or the entire plant from the chart to the Custom library.

Working with the custom library

Load the program on the device

1

Load the program on the device.

Installing an ABT project (no subcontracting)
Installing an ABT project (with subcontracting)