Mixed workflow
I want to use an existing plant as a starting point and modify it for my customer-specific plant but. I also want to create my own plants and add them.
Create a project
1 | Create an ABT project. | |
2 | Define passwords for all users in ABT Site > Settings > User profiles. |
Define the project settings
1 | Select the pre-configuration file for the library behavior in the project. | |
2 | Select the desired notification class template for the behavior in the project. | |
3 | Define building names in Settings > Naming defaults > Object names tab. | |
4 | Define ranges for network properties of automation stations in Settings > Number ranges. |
Create a building structure
1 | Go to Building > Building structure. | |
2 | Define a building structure (buildings, building elements). |
Add a device
1 | Add a device. |
Mixed Workflow
Top-Down | Add a plant | ||
1 | Drag a plant from the Library to Add plant in the Plants navigation view. | ||
2 | (Optional) Rename the plant. | ||
3 | Get an overview of the plant: In Plants navigation view, expand the chart list to see all elements of the plant. In Plants navigation view, expand the Field devices folder to see all field devices. In the Field programming editor, zoom and scroll to see details. | Plants navigation view | |
Change a program block | |||
1 | Drag a new program block from the Library to the chart. | ||
2 | Rename the program block. | ||
3 | (Optional) Show and hide pins. | ||
4 | Connect the I/Os to the new program block. | ||
5 | Delete the existing program block. | ||
Bottom-Up | Create an I/O | ||
1 | Create and assign TX & Onboard I/Os. | ||
2 | Add Modbus devices. | ||
Test I/Os online | |||
1 | Load the program on the device. | Installing an ABT project (no subcontracting) | |
2 | Test loaded I/Os. Use ABT Go, online function of TX I/O configuration or modbus editor. | ||
3 | Upload a device configuration from device. | ||
I/O replacement
1 | Instead of using the plant added from the library, you can replace it by the actual used I/O. |
Load the updated program on the device
1 | Load the updated program on the device. | Installing an ABT project (no subcontracting) |